Concrete Pumping
Services > Projects > Concrete Pumping
Efficient installation of precast concrete elements for fast, precise and reliable project delivery.
The Northwest Rail Link was a major contract awarded in 2013 for a heavy rapid rail transit link to the North-Western suburbs of Sydney. Under the $1.15 billion Tunnel and Station Civil Works contract
Kenny constructions was engaged to deliver both the Clyde Dive structure from the future stabling and Maintenance facility and the permanent lining works in the cavern below.
Kenny Constructions were engaged to construct the permanent lining in Martin Place station with included the construction of invert bases and concrete to the arch lining caverns.
Kenny Construction successfully delivered the tunnel lining works for Five Dock Station, including cavern walls, arch lings and headwalls. Works consisted of large invert slabs, intricate crown reinforcement and hydraulic
Kenny Constructions delivered the permanent structural cavern lining at Woolloongabba Station for Cross River Rail (~$9m), covering twin underground caverns (90 m north, 106 m south) separated by a central shaft.
Delivery of the permanent structural lining to the 280 m long, 14 m high and 20 m wide underground cavern at Roma Street Station. The scope comprised approximately 6,500 m3 of concrete to pump

)
)
)
)
)
)