Tunnel Structures
Services > Projects > Tunnel Structures
Efficient installation of precast concrete elements for fast, precise and reliable project delivery.
Kenny constructions was engaged to deliver both the Clyde Dive structure from the future stabling and Maintenance facility and the permanent lining works in the cavern below.
Kenny Constructions were engaged to construct the permanent lining in Martin Place station with included the construction of invert bases and concrete to the arch lining caverns.
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
Kenny Construction successfully delivered the tunnel lining works for Five Dock Station, including cavern walls, arch lings and headwalls. Works consisted of large invert slabs, intricate crown reinforcement and hydraulic
Delivered the permanent structural cavern lining at Woolloongabba Station for Cross River Rail (~$9m), covering twin underground caverns (90 m north, 106 m south) separated by a central shaft.
Kenny Constructions have been engaged to complete the mined tunnel lining works at Westmead Station as a part of the Sydney Metro West project. Package includes FRP lining of the Cross Over Cavern
Delivery of the permanent structural lining to the 280 m long, 14 m high and 20 m wide underground cavern at Roma Street Station. The scope comprised approximately 6,500 m3 of concrete to pump

)
)
)
)
)
)
)