Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place

Client

Sydney Metro West


Principal Contractor

John Holland CPB JV


Scope of Works

Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place (Blight Street Adit), along with associated shaft enabling works.The permanent lining works comprised large invert pours, sidewall and crown pours, as well as nozzle walls and headwalls.The scope included the placement of approximately 80,000 m³ of concrete and the installation of over 10,000 tonnes of reinforcement.


Project

Eastern Tunnelling Package


Location

New South Wales

Other Projects

Western Tunnelling Package, Clyde
Kenny constructions was engaged to deliver both the Clyde Dive structure from the future stabling and Maintenance facility and the permanent lining works in the cavern below.
Sydney Metro City and Southwest
Kenny Constructions were engaged to construct the permanent lining in Martin Place station with included the construction of invert bases and concrete to the arch lining caverns.
Central Tunnelling Package
Kenny Construction successfully delivered the tunnel lining works for Five Dock Station, including cavern walls, arch lings and headwalls. Works consisted of large invert slabs, intricate crown reinforcement and hydraulic
Cross River Rail, Wolloongabba
Delivered the permanent structural cavern lining at Woolloongabba Station for Cross River Rail (~$9m), covering twin underground caverns (90 m north, 106 m south) separated by a central shaft.
Western Tunnelling Package
Kenny Constructions have been engaged to complete the mined tunnel lining works at Westmead Station as a part of the Sydney Metro West project. Package includes FRP lining of the Cross Over Cavern
Cross River Rail
Delivery of the permanent structural lining to the 280 m long, 14 m high and 20 m wide underground cavern at Roma Street Station. The scope comprised approximately 6,500 m3 of concrete to pump