=

Westmead Station, Western Tunnelling Package

Gamuda & Laing O'Rourke Consortium (GLC)
Home  >  Blog  >  Westmead Station, Western Tunnelling Package
Kenny Constructions have been engaged to complete the mined tunnel lining works at Westmead Station as a part of the Sydney Metro West project. Package includes FRP lining of the Cross Over Cavern

Client

Sydney Metro West


Principal Contractor

Gamuda & Laing O'Rourke Consortium (GLC).


Scope of Works

Kenny Constructions have been engaged to complete the mined tunnel lining works at Westmead Station as a part of the Sydney Metro West project. Package includes FRP lining of the Cross Over Cavern, Station Cavern, Nozzles and Stub tunnels as well as construction of headwalls, deflection walls and plenum slabs. Several bespoke formwork systems, including a hydraulically controlled Euroform system have been used to complete the tunnel lining works. The team used innovative construction techniques including a sacrificial invert formwork system and prefabricated invert and wall reinforcement cages to optimise program and increase efficiency on site


Project

Western Tunnelling Package


Location

New South Wales

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
Sydney Gateway
Kenny Constructions were engaged to undertake many diverse structural concreting aspects of Sydney Gateway.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
President Avenue Pedestrian Bridge , M6 Stage 1
Due to the bridges location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods

Realside acknowledges the Traditional Custodians of the land on which we stand, recognise their enduring connection to this land, waters, and community. We pay our respects to their Elders past, present and emerging. We extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Get in touch

Have a question or need information? We're happy to assist.

Name: