Clyde Dive, Western Tunnelling Package

Gamuda and Laing O’Rourke GLC
Home  >  Blog  >  Clyde Dive, Western Tunnelling Package
Kenny constructions was engaged to deliver both the Clyde Dive structure from the future stabling and Maintenance facility and the permanent lining works in the cavern below.

Client

Sydney Metro West


Principal Contractor

Gamuda and Laing O’Rourke GLC


Scope of Works

Kenny constructions was engaged to deliver both the Clyde Dive structure from the future stabling and Maintenance facility and the permanent lining works in the cavern below. The dive structure was made up of two large retaining walls on either side with a seperation wall down the middle to distinguish between the arrival and departure side and finally two ring beams before the tunnels enter the underground.The permanent lining of the caverns was made up of 3 sections per cavern that reduced in size to allow for the future installation of split tracks for the trains to leave and re enter the main line.


Project

Western Tunnelling Package, Clyde Dive


Location

New South Wales

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
Showground Station, Sydney Metro Northwest Rail Link
Showground Station was part of the Sydney Metro Northwest Rail Link project that officially opened to customers in May 2019. The redevelopment of the Showground Station precinct transformed
Castle Hill Station, Sydney Metro Northwest Rail Link
The Northwest Rail Link was a major contract awarded in 2013 for a heavy rapid rail transit link to the North-Western suburbs of Sydney. Under the $1.15 billion Tunnel and Station Civil Works contract