Five Dock, Central Tunnelling Package

Acciona & Ferrovial JV
Home  >  Blog  >  Five Dock, Central Tunnelling Package
Kenny Construction successfully delivered the tunnel lining works for Five Dock Station, including cavern walls, arch lings and headwalls. Works consisted of large invert slabs, intricate crown reinforcement and hydraulic

Client

Sydney Metro


Principal Contractor

Acciona & Ferrovial JV


Scope of Works

Kenny Construction successfully delivered the tunnel lining works for Five Dock Station, including cavern walls, arch lings and headwalls. Works consisted of large invert slabs, intricate crown reinforcement and hydraulic and conventional formwork systems ranging from Doka to Euroform ensuring precision, structural integrity and efficiency across station cavern lining works


Project

Central Tunnelling Package, Five Dock


Location

New South Wales

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
Sydney Gateway
Kenny Constructions were engaged to undertake many diverse structural concreting aspects of Sydney Gateway.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
President Avenue Pedestrian Bridge , M6 Stage 1
Due to the bridges location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods

Realside acknowledges the Traditional Custodians of the land on which we stand, recognise their enduring connection to this land, waters, and community. We pay our respects to their Elders past, present and emerging. We extend that respect to all Aboriginal and Torres Strait Islander peoples today.

Get in touch

Have a question or need information? We're happy to assist.

Name: