Wolloongabba, Cross River Rail

Cimic/CPB Contractors, BAM, Ghella, UGL JV
Home  >  Blog  >  Wolloongabba, Cross River Rail
Kenny Constructions delivered the permanent structural cavern lining at Woolloongabba Station for Cross River Rail (~$9m), covering twin underground caverns (90 m north, 106 m south) separated by a central shaft.

Client

Queensland Government


Principal Contractor

Cimic/CPB Contractors, BAM, Ghella, UGL JV


Scope of Works

Kenny Constructions delivered the permanent structural cavern lining at Woolloongabba Station for Cross River Rail (~$9m), covering twin underground caverns (90 m north, 106 m south) separated by a central shaft. The works involved ~1,000 t of reinforcement and 10,600 m³ of concrete. The client supplied main arch formwork and materials; the contractor executed all secondary formwork, reinforcement fixing, concrete pumping, placement, and finishing.


Project

Cross River Rail, Wolloongabba


Location

Queensland

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
Sydney Gateway
Kenny Constructions were engaged to undertake many diverse structural concreting aspects of Sydney Gateway.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
President Avenue Pedestrian Bridge , M6 Stage 1
Due to the bridges location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods