Due to the bridges location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods

Client

Transport NSW


Principal Contractor

CPB Contractors, Ghella, UGL JV


Scope of Works

President Avenue Pedestrian Bridge was delivered by Kenny Constructions and was a critical component of the M6 Stage 1 project. The scope included constructions of abutments, footings columns and a bespoke falsework system to support the pigtail bridge structure. It gets the name pigtail bridge because of the unique spiral geometry of the insitu concrete deck.


Overview

Due to the bridge’s location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods to maintain free- flowing and uninterrupted traffic movements. Kenny Constructions in partnership with Arcow developed a tailored falsework solution to accommodate the bridge’s curved geometry.


Outcome

Kenny Constructions ensured the structural package of the M6 Pigtail was delivered meeting all quality and safety standards. Unique in nature, the bridge now stands as a talking point of Sydney's motorway infrastructure network.


Location

New South Wales

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
Sydney Gateway
Kenny Constructions were engaged to undertake many diverse structural concreting aspects of Sydney Gateway.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
Showground Station, Sydney Metro Northwest Rail Link
Showground Station was part of the Sydney Metro Northwest Rail Link project that officially opened to customers in May 2019. The redevelopment of the Showground Station precinct transformed