Victoria Cross Station, Sydney Metro City

John Holland CPB JV
Home  >  Blog  >  Victoria Cross Station, Sydney Metro City
Kenny Constructions are engaged to construct the permanent lining for Victoria Cross Station, which includes the construction of three-metre-deep invert slabs using an innovative prefabricated steel reinforcement cages solution.

Client

NSW Government, Transport for NSW


Principal Contractor

John Holland CPB JV


Scope of Works

Kenny Constructions are engaged to construct the permanent lining for Victoria Cross Station, which includes the construction of three-metre-deep invert slabs using an innovative prefabricated steel reinforcement cages solution. The concrete package also includes the cavern permanent lining structure. Travelling steel hydraulic forms will be used to construct the main cavern and Doka frames will be utilised to construct the adits and cross passages. The Kenny Constructions' team will also deliver complex structures, such as pedestrian adit tunnels, lift adits into cavern roof and escalator shaft tunnel linings.


Overview

Forming an integral part of the Sydney Metro system, Victoria Cross Station is an underground station, over 30 meters below ground-level, located in the heart of the North Sydney Business District.The Victoria Cross Station works are part of the broader Sydney Metro project. For more information about the plans for the Victoria Cross Station and precinct, view this 1-minute video from the Transport for NSW: click here


Outcome

Coming Soon...


Location

New South Wales

Other Projects

Pyrmont Station, Eastern Tunnelling Package
Kenny Constructions was engaged to deliver the permanent lining works for the new Hunter Street Station, including construction of a new pedestrian access tunnel between Hunter Street and Martin Place
WestConnex New M5 (MOC3), Arncliffe
Works included major structural elements for the substation, exhaust and supply shafts, along with extensive retaining wall construction. Hundreds of precast units were installed across a complex, heavily sequenced
Warringah Freeway Upgrade
The Warringah Freeway Upgrade transforms 4 km of motorway to improve traffic flow, safety, and active transport, integrating with future links like the Western Harbour Tunnel.
Sydney Gateway
Kenny Constructions were engaged to undertake many diverse structural concreting aspects of Sydney Gateway.
James Ruse Drive Underbridge, Paramatta Light Rail
James Ruse Drive Underbridge comprised a 7-span bridge built over a live arterial road with complex in-situ elements, FRP works and the installation of a large steel arch bridge launched into position during
M12 West Motorway
The scope included construction of various challenging and architectural reinforced concrete elements including parallelogram shaped piers on Bridge 1, headstocks with radius ends on Bridges 2 and 5
President Avenue Pedestrian Bridge , M6 Stage 1
Due to the bridges location adjacent to a live traffic corridor, detailed staging and planning were essential. The works were delivered through multiple traffic shutdowns and weekend work periods